![]() |
Towel Bar With Bins
|
Towel Bar With Bins Construction | Diagram | Frame | Bins |
Handles | Finished | Another Cab with Bins |
![]() | |
>
![]() | |
H = 8", W = 9-3/8"
|
![]() | Frame pieces cut out, bottom shelf grooved, stop bars glued to top shelf. |
![]() | Close pic of bottom shelf groove. This is the pivot point for the tilt out bins. |
![]() | Biscuit slots cut, 5/8" bar blind holes drilled. Ready to glue. |
![]() | Being glued. The ClampIts keep everything square while the glue sets. |
![]() | Frame ready for paint. |
![]() | Closer look at groove in bottom shelf after the frame is glued. |
![]() | Bin sides cut out. |
![]() | 3 sets of fronts, sides, backs, and bottoms ready to glue. |
![]() | Closer look at mitered edges. |
![]() | Gluing one side to the bottom. |
![]() | Second side being glued to bottom. |
![]() | Closer look at side and back miters where back will be glued. |
![]() | Back being glued on. |
![]() | Two bins with fronts glued. |
![]() | Close look at mitered lower back corner joints after gluing. |
![]() | Glued bin. |
![]() | Bin test fit into frame. |
![]() | Tilt out test, OK. |
![]() | A 2x4 has been ripped into 1-1/;2" X 1-1/2", then the edges rounded on the router table. For more pics please see my Handles and Pulls Page. |
![]() | Bins and frame being painted. |
![]() | From the other side. |
![]() | Finished towel bar with Tilt-out Bins. |
![]() | With bin tilted out. |
![]() | Closer look at bin tilted out. |
![]() | Or you can pull them out and take it to where the contents are needed. |
![]() | With multiple bins in use. |